by Emma Robinson | Feb 26, 2026 | Events, Previous Events
26-27 February 2026, New Delhi Join us as we share our expert knowledge on underground cable monitoring. Synaptec will be attending and presenting, more details to follow soon. Arrange a meeting: Director of business development, Prasanta Das | prasanta.das@synapt.ec...
by Emma Robinson | Nov 27, 2025 | Technical Paper
CIGRE technical brochure 2025 Authors: CIGRE Joint Working Group C4/C2.62/IEEE Date published: November 2025 Summary This Technical Brochure reviews developments in the synchrophasor measurement technology and standards, presents the trends in system architecture,...
by Emma Robinson | Oct 10, 2025 | Technical Paper, Greenlight, Synthesis
CIGRE Symposium in Montreal 2025 Authors: Steven Blair, Marcus Perry, Linu George, Morris Kelly Date Published: October 2025 Summary Over half of the outage time for high-voltage cables is due to failures that occur in joints and terminations. These weak points are...
by Emma Robinson | Oct 9, 2025 | Previous Webinar
Every offshore wind farm or grid operator faces the same challenge: costly cable failures. Each outage can cost more than $10 million in repairs and lost production, with 5–10 failures expected over a project lifecycle. Greenlight® is the first cost-effective...
by Emma Robinson | Jul 10, 2025 | Technology and products, Technical Paper, Mixed circuit protection
CIGRE B5 Colloquium 2025 Authors: Iain Mckeeman, Elliot Hale, Fraser Cadger, Neil Gordon, Steven Blair Date published: July 2025 Summary Distinguishing between faults on mixed conductor circuits can be challenging when relying only on measurements from within the...