Export cable condition monitoring with Vattenfall, UK
Synaptec was commissioned to retrofit the dual export cables of Vattenfall’s Aberdeen Bay offshore windfarm to provide synchronous and permanent harmonic monitoring and termination health monitoring. The ability to correlate electrical and mechanical information in one real-time system enables Vattenfall to identify far earlier the electrical stresses which accelerate cable insulation and termination failures by comparing harmonic content, phase current amplitudes, and termination temperatures over time.
Equipment installed: DES Interrogators, Synthesis®, Photonic Current Transducer and Photonic Temperature Transducer | Communication protocol: IEC 61850-9-2 | Live since: 2021


Get in touch


Related posts
Why Synaptec’s system is safe and easy to install
Because Synaptec's equipment is standard primary instrument transformers and standard single optical mode fibre there are no specialist skills required beyond what is already known by installation contractors. Learn more from our Head of Sensor Technologies, Dr...
Synaptec’s role in offshore wind
Developers and operators of offshore wind farms face unique challenges, as they generate energy from distant locations out at sea, often difficult to access. Synaptec's technology is ideally suited to automate the visibility and control of those turbines and...
How does Synaptec answer the unmet needs of offshore wind?
Today, when a fault occurs in an offshore array cable, typically an entire string of wind turbines are taken out of action for days, weeks or months. In order to find that fault in the first instance, typically an engineer must be sent out in a boat to the...