Dogger Bank offshore windfarm, UK

Dogger Bank is set to be the world’s largest offshore wind farm located more than 130 km off the northeast coast of England, featuring 112 individual 33 kV array cables connecting the largest wind turbine generators ever to be deployed at sea. Synaptec instrumented phases A and B of the windfarm, providing permanent and synchronous monitoring of each individual array cable and their terminations to provide early warning of thermal failure at over 600 locations. This complements the DTS system installed on all 16 strings by adding crucial monitoring of terminations (at which failures are twice as common). Data from both systems is combined into one dashboard view of the cable system as part of Proserv’s power ECG platform.

Equipment installed: Synaptec Interrogators, Synthesis® and Photonic Temperature Transducer | Platform: Synthesis Data Core and Proserv ECG™ | Live date: TBC 2023

Get in touch

Saul Matthews

VP Global Sales

Tel: +44 (0)7525 298 808

Chris Conway

Condition Monitoring Specialist

Tel: +44 (0)7826 851 689

Related posts

Synchromerger

Synchromerger™ is a centralised solution for instrumenting distributed power networks. Benefitting from Synaptec’s passive photonic sensing technology, Synchromerger™ gathers, processes, and streams high-quality, continuous point on wave (CPOW) and...

read more
Synthesis

Synthesis

Synthesis® is a comprehensive visualisation and analytics platform, designed to take full advantage of the unique capabilities of Synaptec’s Distributed Electrical Sensing (DES) technologies.It allows the synchronised waveform outputs from Synaptec’s sensor arrays to...

read more
Euramet

Euramet

Electricity from renewables is helping reduce the emissions that would otherwise be produced from fossil fuels, but network operators struggle in integrating these more distributed sources of energy. One solution is to use smart grids capable of monitoring and...

read more