Export cable condition monitoring with Vattenfall, UK
Synaptec was commissioned to retrofit the dual export cables of Vattenfall’s Aberdeen Bay offshore windfarm to provide synchronous and permanent harmonic monitoring and termination health monitoring. The ability to correlate electrical and mechanical information in one real-time system enables Vattenfall to identify far earlier the electrical stresses which accelerate cable insulation and termination failures by comparing harmonic content, phase current amplitudes, and termination temperatures over time.
Equipment installed: DES Interrogators, Synthesis®, Photonic Current Transducer and Photonic Temperature Transducer | Communication protocol: IEC 61850-9-2 | Live since: 2021
Get in touch
Related posts
Vattenfall
The Aberdeen Offshore Wind Farm (AOWF, also known as the European Offshore Wind Deployment Centre) is operated by Vattenfall. Facilitated by the Offshore Renewable Energy Catapult (OREC), Synaptec retrofitted passive fibre optic sensors to the AOWF to monitor and...
Synthesis® Server
Synthesis® Server provides convenient and secure local hosting of the Synthesis® Core and Visual Core software. It provides a one-box, turn-key solution for collecting and interpreting high-resolution data from many Interrogators, and other data sources. It is...
Primary Current Transducer (PCT)
Synaptec’s Primary Current Transducer (PCT) combines industry-standard current transformers (CTs) with Distributed Electrical Sensing (DES) technology, enabling remote circuits to be instrumented passively without data networks, control power, or expensive civil...